The Supreme Court quashed a ₹53.36 crore GST demand on Sterling and Wilson, holding that solar power systems are not immovable property and the pre-2019 70:30 valuation was only an option.
The 70:30 split between goods and services for solar power generating systems supplied under engineering, procurement and construction (EPC) contracts could not be forced on supplies made before 1 Jan 2019, as it was only an option for those years, the Supreme Court has held. [Sterling and Wilson Pvt. Ltd. v. Union of India & Ors., 2026-juristway.com-3637-SC-GST]
The Bench of Justice Sanjay Kumar and Justice Sanjeev Sachdeva, in a judgment by Justice Kumar, set aside orders dated 17 Jan 2025 and 24 Jan 2025 that demanded central tax and state tax with penalties totalling ₹53,35,80,964 for 1 Jul 2017 to 31 Dec 2018. The Bombay High Court had dismissed the writ petition because an appeal was available.
The Court held that the dismissal was not justified, since the petition raised arguable points. Alternative remedy is not a straitjacket formula. As the issue had already been decided by the Andhra Pradesh High Court, it decided the matter on merits itself rather than remitting it.
The company had paid 5% on the whole value under Serial No. 234 of Notification No. 1/2017-Central Tax (Rate). Notification No. 24/2018 introduced the deemed 70:30 valuation only from 1 Jan 2019. Circular No. 163/19/2021-GST dated 6 Oct 2021 said tax for the earlier period “can be paid” on that basis. The Court read this as an option for taxpayers who wanted it, not a mandate for all.
Since the 70:30 regime did not exist before 2019, no fraud or suppression could be imputed for not applying it, and Section 74 of the Central Goods and Services Tax Act, 2017 (CGST Act) could not be invoked. Relying on Tata Steel Limited v. Union of India (2026), the Court said the foundational facts must appear in the notice itself.
It also rejected the claim that the contracts were works contracts under Section 2(119). A works contract must result in immovable property, and solar panels fixed to a civil foundation only for stability can be detached and used elsewhere. Not every composite supply is a works contract.
The later substitution of “solar power generator” for “solar power generator system” in 2021 could not be applied backwards. The appeal was allowed and both orders were set aside.